Free UK construction calculators Metric and imperial 2026 UK prices

Exterior Cladding Calculator

Work out how much cladding you need for a house, extension, garage or garden room. Enter the wall size, any gable, windows and doors, then press Calculate to see the boards, battens, breather membrane, fixings and cost for timber shiplap, fibre cement or composite cladding.

Type Of Cladding

Batten Spacing

Set to the usual spacing for each cladding. Use 400 mm on exposed, windy sites.

Extra For Cutting

Your Walls

m

Add the lengths of all the walls you are cladding.

m

To the eaves, not including any gable.

Gable Ends
no.

Each taken as 1.2 × 1.2 m.

no.

Each taken as 1.0 × 2.1 m.

no.

For the length of corner trims. A detached garage clad all round has 4.

Prices are typical 2026 UK merchant prices including VAT. Check the cover width of the exact board you buy, as it varies between makers.

How To Use The Exterior Cladding Calculator

  1. Choose the cladding: timber shiplap, fibre cement weatherboard or composite boards. The batten spacing changes to suit, and you can switch it to 400 mm for an exposed site.
  2. Enter the total wall length and the height in metres. Add up every wall you are cladding, and measure the height to the eaves.
  3. Add any gables, with the width at the base and the height up to the ridge.
  4. Count the windows and doors so their area can be taken off, and the external corners for the trims.
  5. Pick the extra for cutting (10% for plain walls, 15% with gables or lots of openings) and press Calculate Cladding.

The result gives the number of boards or lengths, the battens, breather membrane rolls, fixings and corner trims, with the cost of each and the total per square metre. A table compares the three cladding types for the same walls, and the drawing shows your wall with the board lines and battens to scale.

How To Measure Walls For Cladding

Measure each wall along the bottom, from corner to corner, and add the lengths together. Measure the height from where the cladding will start (normally at least 150 mm above the ground or the damp-proof course) up to the underside of the soffit or eaves.

A gable is the triangle above the eaves at the end of a pitched roof. Its area is half the width times the height, so a gable 6 m wide and 2 m high adds 6 m². The calculator takes off 1.44 m² for each window (1.2 × 1.2 m) and 2.1 m² for each door (1.0 × 2.1 m). If your openings are much bigger, such as bifold doors, count them as two or three doors. It is always better to have a few boards left over than to run short, because a later batch may not match in colour.

Exterior Cladding Types Compared

CladdingTypical boardCover per boardUpkeepFire
Timber shiplap19 × 125 mm treated softwoodAbout 105 mm (9.5 m per m²)Re-stain every 3 to 5 yearsCombustible
Fibre cement lap3.6 m × 190 mm × 10 mm160 mm (0.576 m² per board)Pre-painted, wash downA2 (non-combustible)
Composite3.6 m × 157 mmAbout 125 mm (0.45 m² per board)No painting, may fade at firstCombustible

Timber is the cheapest and easiest to work, and suits sheds, garden rooms and rural buildings. Treated softwood needs a stain or paint to keep it looking good; larch and cedar can be left to weather silver. Fibre cement boards look like painted timber but do not rot, and are a safe choice near boundaries because they do not burn. Composite boards are made from wood fibre and plastic, need no painting and clip on with hidden fixings, but cost the most and must be fixed with expansion gaps.

How Many Cladding Boards Per m²?

The key figure is the cover width: how much of each board shows once it is lapped over or locked into the board below. It is always less than the board width. Divide 1 by the cover width in metres to get the metres of board per square metre, then divide by the board length.

CladdingBoardsBattens (4.8 m)FixingsMaterials
Timber shiplap53 × 4.8 m10 at 600 mmAbout 420£943
Fibre cement lap46 × 3.6 m10 at 600 mmAbout 275£992
Composite59 × 3.6 m14 at 400 mmAbout 530£1,288

Fibre cement needs fewer boards because each one covers 160 mm. Composite needs more battens because most makers ask for 400 mm centres. Joints between board ends should land on a batten, and are best staggered so they do not line up up the wall.

Battens, Membrane And Fixings

Cladding is a rainscreen: some water will get behind it, so it needs a ventilated, drained gap. Fix a breather membrane to the wall or timber frame, then vertical treated battens (usually 50 × 25 mm or 50 × 38 mm) at 400 or 600 mm centres to hold the boards off the wall. Fit extra battens each side of every window and door so the board ends are fixed.

  • Breather membrane: rolls are usually 1.5 × 50 m (75 m²). The calculator adds 10% for laps; lap each run at least 100 mm over the one below.
  • Fixings: one per board at every batten for boards up to about 150 mm wide. Use stainless steel or hot-dip galvanised ring-shank nails or screws in timber, so they do not stain or rust, and the maker's screws or clips for fibre cement and composite.
  • Openings at top and bottom: leave a gap at the base and head of the cladding for air, covered with an insect mesh or a vented strip.
  • Trims: corners, window reveals and the top and bottom edges need trims or timber boards. The calculator gives the length for the external corners.

How Much Does Cladding Cost?

Using typical 2026 UK merchant prices including VAT, the materials for boards, battens and membrane come to roughly:

CladdingBoard price usedMaterials per m²
Timber shiplap£3.25 a metre (£15.60 for 4.8 m)About £38 to £45
Fibre cement lapAbout £19 a 3.6 m boardAbout £40 to £48
CompositeAbout £19.50 a 3.6 m boardAbout £53 to £61

Small jobs cost more per square metre because you still have to buy a whole roll of membrane. Trims, fixings, stain and delivery are extra, and premium products such as cedar, larch or branded composite systems can cost two or three times as much. A builder will also charge for labour and scaffolding.

Building Regulations And Fire Safety

Re-cladding a large part of an outside wall can count as renovating a thermal element under the Building Regulations, and new cladding on an extension is part of the building work. Approved Document B limits combustible cladding on a house wall within 1 m of a boundary (it must be class B-s3,d2 or better), and residential buildings with a storey 11 m or more above the ground need non-combustible materials in the external walls. Fibre cement rated A2 is usually accepted in these places; timber and composite often are not. Planning permission may also be needed to change the look of a house in a conservation area or on a listed building, so check with your council before you start.

How The Calculator Works

Wall area = length × height + gables × ½ × width × height

Area to clad = wall area − windows × 1.44 m² − doors × 2.1 m²

Boards = area to clad × (1 + extra) ÷ (cover width × board length), rounded up

Battens = (wall area ÷ spacing + 2 × opening heights) × 1.10 ÷ 4.8 m · Membrane = wall area × 1.10 ÷ 75 m²

Fixings = area to clad ÷ (cover width × spacing) × 1.10 · Corner trims = corners × wall height

The membrane and battens go over the whole wall, while the boards are only needed where there is no window or door. The figures are estimates for ordering; always check the cover width and fixing rules in the maker's guide.

Exterior Cladding FAQs

How do I work out how much cladding I need?

Multiply the wall length by its height, add any gables (half the width × height), take off the windows and doors, and add 10 to 15% for cutting. Divide by the area each board covers.

How many metres of shiplap do I need per m²?

For 19 × 125 mm shiplap with a cover of about 105 mm, about 9.5 metres per square metre, before adding for cutting.

How many Cedral boards per m²?

A Cedral Lap board is 3.6 m long and covers 160 mm once lapped, so 0.576 m² a board, or about 1.75 boards per m².

What spacing should cladding battens be?

Usually 600 mm centres for timber and fibre cement, and 400 mm for most composite cladding. Use closer centres on exposed sites and always follow the maker's guide.

Do I need a breather membrane behind cladding?

Yes on a timber frame or a wall that needs protecting from rain. It keeps wind-driven rain out while letting water vapour escape, and goes behind the battens.

Which cladding is cheapest?

Treated softwood shiplap is the cheapest at about £3.25 a metre. Fibre cement costs a little more overall and composite cladding the most.

Can I put cladding near a boundary?

Within 1 m of a boundary, house walls generally need cladding of limited combustibility, such as A2 fibre cement. Timber and composite are often not allowed there.

Which way should cladding boards go?

Shiplap and lap boards are fixed horizontally on vertical battens. Vertical cladding needs horizontal battens with counter-battens behind, so air and water can still drain.

More Building Calculators

Board sizes from Cedral Lap (3600 × 190 mm, 160 mm cover), merchant data for 19 × 125 mm shiplap (about 9.5 m per m²) and Cladco composite cladding (0.45 m² per board). Battens 50 × 25 mm × 4.8 m; breather membrane 1.5 × 50 m. Typical 2026 UK prices including VAT. Fire limits from Approved Document B. Reviewed November 2026.