Free UK construction calculators Metric and imperial 2026 UK prices

Concrete Bag Calculator

Work out how many 10 kg, 20 kg or 25 kg bags of ready-mixed concrete you need for a slab, shed base, fence posts, footing, column or steps. Enter your sizes in metric or imperial. You get the bag count, total weight, water and cost, plus a drawing of your job.

Choose The Job

Enter Your Measurements

m
m
mm

Shed bases are often 75–100 mm thick. 100 mm = 0.1 m.

Bag Size
%
Bag Yield And Price (Optional)
litres

Pack says "makes 0.012 m³"? Enter 12.

£

Cost rows show when you add a price.

This tool works out quantity only. Slab thickness, strength and any steel mesh should follow your plans, a structural engineer or building control.

How To Use The Concrete Bag Calculator

This concrete bag calculator turns your measurements into a bag count you can take to the builders' merchant. It takes about a minute.

  1. Choose your job. Pick a slab or shed base, fence post holes, a strip footing, a round column, steps, or enter a volume you already know.
  2. Enter your sizes. Use metres and millimetres, or switch to feet and inches. Long sizes go in metres. Thickness and hole sizes go in millimetres.
  3. Pick your bag size. Choose 10 kg, 20 kg or 25 kg. If your pack prints a yield, add it under "Bag Yield And Price" for the most accurate count.
  4. Set the waste. 10% suits most jobs. Use 5% for neat formwork on a flat base and 15% for rough holes or uneven ground.
  5. Press Calculate Bags. You get the bags to buy, the total weight, a water estimate and the cost if you added a price. The result updates as you change any box.

The calculator always rounds the bag count up. Running out halfway through a pour leaves a weak joint, so a spare bag is cheap insurance.

What Is In A Bag Of Ready-Mixed Concrete?

A bag of ready-mixed concrete holds everything you need except water. Inside is a dry blend of cement, sand and gravel, already measured out in the right amounts. You tip it into a mixer or barrow, add clean water and mix. That is why it suits small jobs so well: there is no need to buy cement and ballast separately and get the ratio right yourself.

Builders' merchants and DIY stores sell several bags that look alike, so it pays to check the label before you load up the trolley.

Bag saysWhat is insideUse it forUse this calculator?
Concrete mix / ready-mixed concreteCement, sand and gravelSlabs, bases, footings, steps, post holesYes
Post mix / rapid-set post fixFast-setting cement and aggregateSetting fence and gate posts quicklyYes, but check the yield on the pack
CementCement powder onlyMixing your own concrete with ballastNo, you also need ballast
All-in ballastSand and gravel, no cementMixing your own concrete with cementNo
Mortar mixCement and fine sand, no gravelBricklaying, pointing, bedding slabsNo, mortar is not concrete

If you would rather mix from loose materials, a common general-purpose site mix is about 1 part cement to 5 parts all-in ballast by volume. Our ballast calculator works out how much of each you need. For a handful of bags, though, ready-mixed concrete saves time and gives a more consistent result.

How Many Bags Of Concrete Per m³?

Bagged ready-mixed concrete is a dry blend of cement, sand and gravel. Once you add water and compact it, roughly 2,100 kg of dry mix fills one cubic metre. That gives the figures below. They are before any waste is added.

Bag sizeYield per bagBags per 1 m³Bags per 0.5 m³Bags per 0.1 m³
10 kg4.8 litres21010521
20 kg9.5 litres1055311
25 kg11.9 litres84429

Different brands vary a little. Some 25 kg packs state a yield of about 0.011 m³ and others about 0.012 m³. Always check the back of the bag from your supplier, such as Tarmac or Blue Circle, and type that yield into the calculator if it differs.

Concrete Bags Per m² For Slabs And Bases

For a flat area such as a shed base, patio pad or hot tub base, it helps to know how many bags each square metre needs at a given thickness. Multiply the figure by your area in m², then add waste.

ThicknessVolume per m²25 kg bags per m²20 kg bags per m²Typical use
50 mm0.05 m³4.25.3Path topping, small pads
75 mm0.075 m³6.37.9Small shed base, paths
100 mm0.1 m³8.410.5Shed and garden room bases
150 mm0.15 m³12.615.8Heavier bases, light vehicle use

A base this size often sits on a compacted sub-base of MOT Type 1. You need that layer as well, but it is not concrete and is not counted here. Use our aggregate calculator to work out the tonnes of sub-base for the same area.

How Many Bags For Common Garden Jobs?

Most people searching for a concrete bag calculator have one of a handful of jobs in mind. The table below shows typical sizes and the bag count our calculator gives for each one, with a 10% waste allowance already added. Use it as a quick sense check, then enter your own measurements above for an exact figure.

JobTypical sizeVolume with waste25 kg bags20 kg bagsWeight (25 kg bags)
Small shed base1.8 m × 1.2 m × 75 mm0.18 m³1519375 kg
Standard shed base2.4 m × 1.8 m × 100 mm0.48 m³40501,000 kg
Large shed or garden room base3 m × 2.4 m × 100 mm0.79 m³67841,675 kg
Hot tub base2.2 m × 2.2 m × 100 mm0.53 m³45561,125 kg
Greenhouse pad2.5 m × 1.9 m × 75 mm0.39 m³3342825 kg
Garden path5 m × 0.9 m × 75 mm0.37 m³3239800 kg
One fence post300 mm hole, 600 mm deep, 100 mm post0.04 m³45100 kg
Ten fence postsSame holes as above0.40 m³3443850 kg
Garden wall footing5 m × 450 mm × 225 mm deep0.56 m³47591,175 kg
Three garden steps1 m wide, 150 mm rise, 250 mm going0.25 m³2126525 kg

Look at the weight column before you set off to collect the bags. Even a standard shed base comes to around a tonne of concrete, which is far more than most cars can carry in one trip. If the footing is for a garden wall, the block calculator tells you how many blocks to order for the wall itself. Laying a lawn around a new base or path? Our artificial grass calculator covers that part of the garden.

The Formulas Behind The Calculator

Every job type is worked out the same way. First find the volume in cubic metres, then add waste, then divide by how much one bag makes.

Bags = (Volume × (1 + Waste %)) ÷ Yield per bag → round up
Yield per bag (m³) = Bag weight (kg) ÷ 2,100

Slab Or Shed Base

Volume = length × width × depth. Turn the depth into metres first, so 100 mm becomes 0.1 m.

Fence Post Holes

Volume per hole = π × radius² × depth, minus the space the post takes up (post width² × depth). Multiply by the number of holes.

Strip Footing Or Trench

Volume = length × width × concrete depth. Use the depth of concrete, not the full dig depth.

Round Column Or Tube

Volume = π × radius² × height × number of columns.

Concrete Steps

Each step is a solid block. Volume = width × rise × going × n × (n + 1) ÷ 2, where n is the number of steps.

Worked Examples

These use the same maths as the calculator above, with 10% waste and the typical yield.

Example 1: A 3 m × 2.4 m Shed Base, 100 mm Thick

Volume = 3 × 2.4 × 0.1 = 0.72 m³. Add 10% and you get 0.792 m³. One 25 kg bag makes about 11.9 litres, so 0.792 ÷ 0.0119 = 66.5. Round up to 67 bags of 25 kg, weighing 1,675 kg. With 20 kg bags you would need 84. At this size it is worth getting a ready-mix quote too.

Example 2: Six Fence Posts

Each hole is 300 mm across and 600 mm deep, with a 100 mm square post. One hole holds π × 0.15² × 0.6 = 0.0424 m³. The post takes up 0.1 × 0.1 × 0.6 = 0.006 m³, leaving 0.0364 m³. Six holes need 0.2185 m³, or 0.2403 m³ with 10% waste. That is 21 bags of 25 kg or 26 bags of 20 kg.

Example 3: Three Garden Steps

The steps are 1 m wide, with a 150 mm rise and a 250 mm going. Volume = 1 × 0.15 × 0.25 × 3 × 4 ÷ 2 = 0.225 m³. With 10% waste it is 0.2475 m³, which needs 21 bags of 25 kg or 26 bags of 20 kg.

How To Measure Your Job Accurately

A bag count is only as good as the measurements behind it. A few millimetres of extra depth across a whole base can add several bags, so it is worth taking a little care before you type the numbers in.

Measure Depth In Several Places

Ground is rarely perfectly level. Check the depth from the top of your formwork to the sub-base at each corner and in the middle, then use the average. If one end is much deeper than the other, measure along the length every metre or so and average all of the readings.

Split Odd Shapes Into Rectangles

For an L-shaped base or a path with a turn, divide the area into simple rectangles. Work out each one with the slab option, then add the bag counts together. For a round pad, use the column option with a height equal to the slab depth and a count of one.

Measure Inside The Formwork

Take your length and width from the inside faces of the timber shuttering, not the outside. The thickness of the boards does not hold any concrete, and measuring to the outside can overstate a small base by a surprising amount.

Check Post Holes After Digging

Holes dug by hand or with an auger often end up wider at the top than the bottom. Measure the diameter at the top and halfway down and use a figure between the two. If the sides crumbled while you were digging, choose the 15% waste option.

20 kg Or 25 kg Concrete Bags?

Both sizes hold the same mix. The choice comes down to handling, price and what your local merchant stocks.

20 kg Bags

  • Easier to lift and carry for most people
  • Common in DIY stores
  • About 25% more bags to buy, open and mix
  • Usually a higher cost per m³

25 kg Bags

  • Fewer bags for the same volume
  • Common at trade merchants
  • Heavier, so lift with care
  • Often cheaper per m³

For guidance on lifting heavy sacks safely, see the HSE manual handling advice. Rapid-set post mixes are sold in similar sizes but can yield a little differently. Use the yield box if your pack shows one.

Bags Or Ready-Mix: Which Is Cheaper?

Bags are ideal for small jobs. As the volume grows, mixing by hand gets slow and the cost per cubic metre climbs. Use these rough limits:

  • Up to 0.1 m³ (about 9 × 25 kg bags): bags are the obvious choice. Mix in a barrow.
  • 0.1 to 0.5 m³: bags still work well. Hire a cement mixer above about 20 bags.
  • 0.5 to 1 m³: get a price for a mini-mix or volumetric truck as well. It is often close in cost and saves hours.
  • Over 1 m³: ready-mix is almost always cheaper and gives a more even pour.

When you ask for a ready-mix quote, give the supplier the "volume to buy for" from the calculator result. That figure already includes waste.

Buying, Carrying And Storing Concrete Bags

Where To Buy

Builders' merchants and the large DIY chains in the UK stock ready-mixed concrete in 20 kg and 25 kg bags. Trade counters tend to favour 25 kg bags, while DIY stores often sell smaller packs and multi-buy deals. For bigger orders, ask the merchant about a full pallet delivered to your drive. The number of bags on a pallet varies by supplier, so check before you order.

Getting The Bags Home

Every car has a maximum payload, listed in the handbook, that covers passengers as well as cargo. Twenty 25 kg bags weigh 500 kg, which is at or above the limit for many family cars. The calculator shows how many trips you would need at around 400 kg a load. If the total runs into tonnes, delivery is safer and usually saves money on fuel and time.

Storing Bags Before You Use Them

  • Keep bags off the ground on a pallet or boards, so they do not draw up moisture.
  • Store them indoors or under a waterproof sheet, with the sheet weighed down.
  • Do not use a bag that has gone hard or lumpy. Damp has started to set the cement and the concrete will be weak.
  • Check the date printed on each bag and use older stock first.

How Much Waste To Add

Real ground is never perfectly flat, and some concrete is always lost in the mixer, the barrow and on the boots. A waste allowance covers this.

WasteWhen to use it
5%Timber formwork on a well-levelled, compacted sub-base
10%Most slabs, footings and steps. The default in this calculator
15%Hand-dug post holes, rough trenches, soft or uneven ground

Metric And Imperial Conversions

Concrete is sold by the cubic metre in the UK, but plenty of plans and older tape measures still use feet and inches. The calculator converts for you when you press Imperial. If you are working by hand, these are the figures you need.

UnitEqualsHandy to know
1 metre3.281 feetA 3 m base is just under 10 ft
1 foot0.3048 metresMultiply feet by 0.3048 to get metres
1 inch25.4 millimetresA 4 in slab is about 100 mm
100 millimetres3.94 inchesThe most common shed base depth
1 cubic metre35.31 cubic feetAbout 84 bags of 25 kg
1 cubic metre1.308 cubic yardsUS and older plans often use yards
1 cubic yard0.7646 cubic metresAbout 64 bags of 25 kg
1 cubic metre1,000 litresA 25 kg bag makes about 11.9 litres
1 square metre10.76 square feetUseful when pricing by area

How To Mix Bagged Concrete Step By Step

Good mixing matters as much as the right number of bags. A well-mixed batch is easier to place, finishes better and ends up stronger.

Mixing By Hand

  • Empty the bag into a wheelbarrow or onto a mixing board.
  • Make a hollow in the middle of the pile.
  • Add about half of the water shown on the pack.
  • Fold the dry mix into the water with a shovel or hoe.
  • Add the rest of the water a little at a time until the mix holds its shape.
  • Keep turning until the colour is even and no dry pockets remain.

Using A Cement Mixer

  • Start the drum turning before you add anything.
  • Pour in most of the water first.
  • Add the bag a bit at a time so it does not stick at the back of the drum.
  • Top up with water slowly until the mix slumps slightly off the blades.
  • Let it turn for a few minutes so everything is fully combined.
  • Rinse the drum between batches if you stop for a break.

Aim for a consistency like thick porridge. If you squeeze a handful in a gloved hand it should hold together without water running out. Too wet and the concrete will shrink and crack; too dry and it will not compact properly around posts or into the corners of your formwork.

Mixing Tips And Safety

  • Add water slowly and follow the amount printed on the bag. Too much water makes weak concrete. The water figure in the calculator is a rough guide only.
  • Mix each bag fully, so no dry pockets are left.
  • Pour in one go where you can, so you do not get cold joints.
  • Keep fresh concrete damp and covered for a few days while it cures. Protect it from frost and hot sun.
  • Wet cement can cause serious burns to skin and eyes. Wear gloves, long sleeves and eye protection. Read the HSE guidance on cement.

Check whether your project needs planning permission or building regulations approval before you dig. The Planning Portal covers outbuildings, garden walls and more.

Setting And Curing Times

Concrete does not dry like paint. It hardens through a chemical reaction between the cement and the water, and that reaction carries on for weeks. Keeping it damp for the first few days helps it reach full strength. The times below are typical for standard bagged concrete in mild weather. Cold weather slows everything down, so always follow the instructions on your pack.

StageTypical timeWhat you can do
Initial setA few hoursSurface starts to stiffen; finish the top before this
Light foot trafficAbout 24 to 48 hoursWalk on it carefully and remove formwork
Normal useAbout 7 daysBuild a shed on the base or set up a hot tub frame
Close to full strengthAbout 28 daysHeavier loads such as a car on a thicker slab
Rapid-set post mixMinutes rather than hoursHold the post upright; check the pack for exact times

Working In Cold, Hot Or Wet Weather

  • Cold: do not pour if frost is forecast or temperatures are close to freezing. Check the Met Office forecast for the next few nights before you start. Ice crystals can damage the surface before the concrete has set.
  • Hot: in warm sun the surface can dry before the inside has cured. Mist it with water and cover it with plastic sheeting for the first few days.
  • Rain: keep a sheet handy. Heavy rain on fresh concrete washes out the surface and leaves it weak and dusty.

Common Mistakes When Buying Concrete Bags

  • Mixing up mm and m. 100 mm is 0.1 m, not 100 m. The calculator warns you if a number looks wrong.
  • Using the dig depth for a footing. Only count the depth that will be filled with concrete.
  • Forgetting the post. A post takes up space in the hole, so you need less concrete than an empty hole.
  • Buying cement instead of concrete. A bag of cement is only the binder. You need ready-mixed concrete or cement plus ballast.
  • No spare. Always round up and keep a bag or two spare.
  • Overloading the car. 20 bags of 25 kg weigh 500 kg. Check your car's payload or ask for delivery.

Concrete Bag Calculator FAQs

How many 25 kg bags of concrete do I need for 1 m³?

About 84 bags of 25 kg make 1 m³, using a typical yield of 11.9 litres per bag. Add your waste allowance on top. With 10% waste you would buy about 93 bags.

How many 20 kg bags of concrete make 1 m³?

About 105 bags of 20 kg make 1 m³. Each 20 kg bag gives about 9.5 litres of concrete.

How much does one 25 kg bag of concrete cover?

One 25 kg bag makes about 0.0119 m³. At 100 mm thick that covers about 0.12 m². At 50 mm thick it covers about 0.24 m².

How many bags of concrete do I need for a fence post?

A 300 mm wide, 600 mm deep hole with a 100 mm post needs about 0.036 m³. That is about 3 to 4 bags of 25 kg per post, depending on your waste allowance. Use the fence post option above for your exact sizes.

How many bags of concrete do I need for a shed base?

A 3 m × 2.4 m base at 100 mm thick needs 67 bags of 25 kg with 10% waste. Smaller sheds need less. Enter your shed size above for an exact count.

Is it cheaper to use bags or ready-mix concrete?

Bags are usually best below about 0.5 m³. Above about 1 m³, ready-mix or a volumetric truck is normally cheaper per m³ and much faster. In between, compare quotes.

How much water do I add to a bag of concrete?

Follow the instructions on your bag. As a rough guide, a 25 kg bag needs around 2 to 3 litres. Add it bit by bit until the mix is workable but not runny.

Can I use this calculator in feet and inches?

Yes. Switch to Imperial and enter long sizes in feet and thickness in inches. The result still shows cubic metres, plus cubic feet and cubic yards.

Why does the calculator round up?

You cannot buy part of a bag, and running short mid-pour is worse than having one spare. The result shows the exact figure before rounding so you can see how close it is.

Does the bag count include the sub-base?

No. The count is for concrete only. Hardcore or MOT Type 1 under a slab is a separate material.

How long does bagged concrete take to set?

Standard bagged concrete usually starts to stiffen within a few hours and can take careful foot traffic after about a day or two. Leave a base for around a week before heavy use. It keeps gaining strength for about four weeks. Rapid-set post mixes set much faster, so follow the pack.

What is the difference between concrete mix and post mix?

Both contain cement and aggregate. Post mix is made to set very quickly so a fence post stays upright without propping. Standard concrete mix gives you more working time, which suits slabs, footings and steps.

Can I use mortar mix instead of concrete?

No. Mortar has fine sand but no gravel, so it is not strong enough for slabs, bases or post holes. It is made for laying bricks, pointing and bedding paving.

Can I pour bagged concrete in cold or wet weather?

Avoid pouring when frost is forecast or temperatures are near freezing, as ice can damage the concrete before it sets. In rain, cover fresh concrete with a sheet so the surface is not washed out.

How many 25 kg bags can I carry in my car?

It depends on your car's payload, which is in the handbook and includes passengers. Twenty 25 kg bags weigh 500 kg, which is at or over the limit for many cars. The calculator assumes about 400 kg per trip.

Do I need a cement mixer?

For up to about 20 bags you can mix by hand in a wheelbarrow. Above that, hiring a mixer saves a lot of effort and gives a more even mix.

Can I mix half a bag of concrete?

You can, but the gravel can settle to the bottom of the bag. Turn the dry contents over first so each half has the same mix. Mixing whole bags gives the most consistent result.

More Construction Calculators

Planning more of the job? These tools work alongside the concrete bag calculator.

Figures use a typical placed density of 2,100 kg of dry bagged mix per m³. Product yields vary, so always check the pack. Reviewed November 2026. See our Disclaimer.