Free UK construction calculators Metric and imperial 2026 UK prices

Block Paving Calculator

Work out how many paving blocks you need for a driveway, patio or path, with the sharp sand, Type 1 sub-base, kiln-dried jointing sand, edging and cost. Pick the block size, thickness and pattern, enter the size of the area and press Calculate.

Shape Of The Area

What Is It For?

Laying Pattern

Herringbone locks tightest under car tyres but needs more cutting, so it has more extra.

Enter The Size

m
m
Block Size
Block Thickness
Colour (For The Drawing)
Build-Up
mm
mm
%
Edging

Patios and paths: 100 mm of Type 1. Car driveways: 150 mm, or 200 mm on soft clay. The sand bed is about 50 mm loose, which packs down to 30–40 mm.

Prices (Optional)
£

Leave blank for a typical 2026 price for the thickness.

£

Enter 0 if you are laying it yourself.

£
£
£
£

In England, a new front driveway over 5 m² needs planning permission unless it is permeable or drains onto your own garden. Standard block paving on sand needs a soakaway or a lawn to drain into.

How To Use The Block Paving Calculator

  1. Pick the shape of the area. Use L-Shape for a drive with a path down the side, or Known Area if you already have the m² from a plan.
  2. Say what it is for and choose the laying pattern. A car driveway sets 60 mm blocks on 150 mm of Type 1; a patio or path sets 50 mm blocks on 100 mm.
  3. Choose the block size and thickness. Most UK block paving is 200 × 100 mm, which is 50 blocks to the square metre.
  4. Enter the sizes and press Calculate Block Paving. Change the prices if you have quotes, or enter 0 for labour if you are laying it yourself.

The result gives the number of blocks and the m² to order, the weight for delivery, the bulk bags of sharp sand and Type 1, the bags of kiln-dried sand, the edging kerbs, how deep to dig and the cost. A plan shows your pattern and a cross-section shows each layer.

How Many Paving Blocks Per m²?

Divide one square metre by the face of one block. A standard 200 × 100 mm block covers 0.02 m², so you need 50 per m². Merchants quote coverage this way, ignoring the 2–5 mm joints, so the extra you add for cuts also covers the joint gaps.

Block sizeFace areaBlocks per m²Blocks for 10 m², no extra
200 × 100 mm0.020 m²50500
210 × 105 mm0.022 m²45.4454
200 × 200 mm0.040 m²25250
240 × 160 mm0.038 m²26260
300 × 200 mm0.060 m²16.7167

Some ranges, such as tumbled or "cobble" blocks, come in packs of mixed sizes sold by the m². For those, choose Known Area in the result and order the m² figure rather than a block count.

Laying Patterns And How Much Extra To Add

PatternExtra for cutsBest for
Stretcher bond5%Paths and patios; quick to lay with few cuts
Basketweave5%Patios and courtyards; decorative, not for cars
Herringbone 90°7%Driveways; the blocks interlock under turning tyres
Herringbone 45°10%Driveways; strongest, but every edge block is cut

Herringbone is the standard choice for driveways because each block is held on all four sides by blocks running the other way, so car tyres cannot push rows along. Laid at 45°, every block against an edge needs a cut, so allow about 10%. Keep the spare blocks: a few matching blocks make repairs invisible years later.

Which Block Thickness Do You Need?

ThicknessUseWeight per m²Kiln-dried sand per m²
50 mmPaths, patios, light garden useAbout 115 kgAbout 3.3 kg
60 mmCar drivewaysAbout 138 kgAbout 4.5 kg
80 mmVans, heavy vehicles, shared accessAbout 184 kgAbout 5.7 kg

Thicker blocks spread a wheel load over more of the bed and are less likely to rock or crack, so do not use 50 mm blocks where cars will drive. The weights matter when ordering: 40 m² of 60 mm blocks is about 5.9 tonnes, which comes on a lorry with a crane offload. Check the drop-off spot can take a pallet.

The Build-Up Under The Blocks

Block paving is a flexible pavement: the blocks sit on a bed of damp sharp sand, over a compacted granular sub-base, held in by firm edges. Marshalls, the UK's biggest paving maker, asks for a 50 mm layer of damp sharp sand under the blocks, and most domestic drives use 150 mm of compacted Type 1.

LayerPatio or pathCar driveway
Blocks50 mm60 mm
Sharp sand laying course50 mm loose (30–40 mm packed)50 mm loose (30–40 mm packed)
Type 1 sub-base, compacted100 mm150 mm (200 mm on soft clay)
Total dig below finished levelAbout 200 mmAbout 260 mm

The sand bed is not a levelling layer: form the falls in the sub-base and keep the sand an even thickness, or the blocks will settle unevenly. Dug soil bulks up by about a quarter, so a 40 m² drive dug 260 mm deep gives about 13 m³ of spoil: three 8-yard skips, or one grab lorry. Our MOT Type 1 calculator and skip hire cost calculator go into more detail.

Materials For Common Block Paving Jobs

JobBlocksSharp sandType 1Kiln-dried sand
10 m² path, 50 mm, stretcher5250.88 t (2 bulk bags)2.31 t2 bags
20 m² patio, 50 mm, stretcher1,0501.76 t (3 bulk bags)4.62 t3 bags
15 m² single drive, 60 mm, herringbone8031.32 t (2 bulk bags)5.2 t3 bags
40 m² double drive, 60 mm, herringbone2,1403.52 t (5 bulk bags)13.86 t8 bags
60 m² large drive, 60 mm, herringbone3,2105.28 t (7 bulk bags)20.79 t11 bags

These use 200 × 100 mm blocks, a 50 mm sand bed, 100 mm of Type 1 for paths and patios and 150 mm for drives, with 5% extra blocks for stretcher bond and 7% for herringbone. For Type 1 in loose bulk bags, divide the tonnes by 0.85.

Kiln-Dried Jointing Sand

After the blocks are laid, fine kiln-dried sand is brushed into the joints and vibrated down with a plate compactor. It locks the blocks together, so it is not optional. Use about 3.3 kg per m² for 50 mm blocks, 4.5 kg for 60 mm and 5.7 kg for 80 mm, which merchants quote from their coverage guides. One 25 kg bag does about 5–7 m² of 60 mm block paving.

Brush in sand, compact, then brush in more. The joints settle over the first few weeks, so keep a spare bag and top them up after heavy rain. Only sweep sand in when the blocks are bone dry, or it sticks to the surface instead of falling into the joints.

Block Paving Costs In 2026

ItemTypical 2026 UK price
Concrete blocks, 50 mm£15–£22 per m²
Concrete blocks, 60 mm£18–£28 per m²
Concrete blocks, 80 mm£25–£35 per m²
Clay pavers£40–£70 per m²
Sharp sand, bulk bag£55–£75
Type 1, per tonne£35–£50
Kiln-dried sand, 25 kg£5–£8
Edging kerb, 915 mm£3–£6 each
Fully laid, concrete blocks£70–£120 per m²

Across 2026 UK cost guides, a concrete block paving driveway costs about £70–£120 per m² fully laid, including digging out, the sub-base and edging. Clay and permeable blocks cost more. Labour is roughly half the bill, so a DIY patio can cost under £40 per m² in materials. Removing an old concrete drive, poor ground or a long way to barrow the spoil all add to the price, so get at least three written quotes.

Planning Permission And Drainage

In England, you need planning permission to pave more than 5 m² of a front garden with a surface that lets rainwater run onto the road. You do not need it if the paving is permeable, or if water drains from it onto a lawn, border or soakaway on your own land. The government's guidance on permeable surfacing of front gardens shows the options.

Standard block paving on sand counts as impermeable, because the joints soon seal with dirt. Either lay a fall to a planted area or a soakaway, use a permeable block system with wider joints and a clean stone sub-base, or ask a builder about a channel drain. A new dropped kerb always needs council approval. The rules differ in Wales, Scotland and Northern Ireland, so check with your council.

How The Calculator Works

Blocks = area × (1,000,000 ÷ (block length × block width in mm)) × (1 + extra %), rounded up

Sharp sand (t) = area × bed depth (m) × 1.6 t/m³ × 1.1
Type 1 (t) = area × sub-base depth (m) × 2.1 t/m³ × 1.1

Jointing sand = area × 3.3, 4.5 or 5.7 kg per m² · Edging kerbs = edge length ÷ 0.915 m

The 10% on sand and Type 1 allows for compaction and uneven ground. Sand and Type 1 bulk bags are taken as 850 kg. Block weight uses concrete at about 2,300 kg per m³. The cost is the m² of blocks you order, the bulk bags, bags and kerbs at your prices, plus labour per m² of area. We use the same densities as our sand calculator and concrete driveway calculator, so results match across the site.

Laying Block Paving, Step By Step

  1. Mark out and dig. Dig to the full depth, keeping the finished paving at least 150 mm below the damp-proof course and falling away from the house at about 1 in 60.
  2. Set the edges first. Bed edging kerbs or a soldier course on concrete and haunch the back, so the blocks have something firm to push against.
  3. Lay and compact the Type 1 in layers of no more than 100 mm, with several passes of a plate compactor on each layer, shaping the falls as you go.
  4. Screed the sand bed to an even 50 mm with screed rails, and do not walk on it once it is levelled.
  5. Lay the blocks from a straight edge, working off the laid blocks. Cut the edges with a block splitter or a disc cutter, never leaving slivers smaller than a quarter of a block.
  6. Joint and compact. Sweep in kiln-dried sand, run the plate over with a rubber mat to protect the faces, then sweep in more sand until the joints stay full.

Block Paving Calculator FAQs

How many paving blocks do I need per m²?

50 blocks per m² for standard 200 × 100 mm blocks, before adding extra for cuts. Allow 5% more for stretcher bond and 7–10% for herringbone.

How much sand do I need for block paving?

About 88 kg of sharp sand per m² for a 50 mm bed, including 10% for compaction, so one 850 kg bulk bag covers about 9.6 m². You also need about 3.3–5.7 kg of kiln-dried sand per m² for the joints.

How deep should the sub-base be for block paving?

100 mm of compacted Type 1 for patios and paths, and 150 mm for car driveways, or 200 mm on soft clay ground.

How deep do I need to dig for a block paved driveway?

About 260 mm below the finished level: 60 mm blocks, a 50 mm sand bed and 150 mm of Type 1. A patio with 50 mm blocks needs about 200 mm.

Should I use 50 mm or 60 mm block paving?

Use 60 mm blocks anywhere a car will drive. 50 mm blocks are fine for patios and paths, and 80 mm suits vans and heavy vehicles.

What is the best pattern for a block paving driveway?

Herringbone, at 90° or 45°. The blocks interlock so turning tyres cannot push them out of line. Stretcher bond and basketweave suit paths and patios.

How much does block paving cost per m²?

In 2026 a concrete block paving driveway costs about £70–£120 per m² fully laid. The materials alone are about £30–£45 per m² for a DIY job.

Do I need planning permission for a block paved drive?

In England, yes if you pave more than 5 m² of a front garden and the water runs onto the road. No if you use permeable paving or drain it onto your own garden.

More Construction Calculators

Laying course depth from Marshalls' block paving guide. Jointing sand rates from UK merchant coverage guides. Sharp sand at 1.6 t/m³ and compacted Type 1 at 2.1 t/m³, as across ConstructionMath. Default prices are typical 2026 UK merchant prices including VAT, and fitted costs come from 2026 UK cost guides; prices vary by region and supplier. Reviewed November 2026.